TL;DR: NA conversion in Gujarat is the permission to use agricultural land for housing, commerce or industry. The District Collector grants it under Section 65 of the Gujarat Land Revenue Code, and you apply online through iORA. Clean files with matching records, an approved layout and a legal access road move fastest, usually in about 45 to 90 days.

What is NA conversion in Gujarat?
Owners can use agricultural land in Gujarat only for farming until the government permits another use. NA (“non-agricultural”) conversion is that permission. As a result, without an NA order, you cannot legally build a house, shop or factory on farmland.
NA conversion in Gujarat also matters for who can buy. Generally, only farmers can buy agricultural land, and NRIs cannot buy agricultural land at all. Once land has a valid NA order, however, it becomes open to non-farmer buyers, which is why sellers offer most residential plots near cities and growth corridors as NA plots.
Which law and authority govern NA conversion?
The key points are:
| Item | Details |
|---|---|
| Law | Section 65, Gujarat Land Revenue Code, 1879 |
| Authority | District Collector (in some rural cases, an authorised district officer) |
| Where to apply | iORA portal (Integrated Online Revenue Applications) |
| Fees | Conversion tax and premium linked to jantri rates and land use, plus measurement fees |
| Typical time | About 45 to 90 days for a clean, undisputed file |
What documents are needed for NA conversion in Gujarat?
In practice, a complete file is the single biggest factor in speed. Therefore, gather these before you apply:
- Digitised 7/12 and 8A extracts for the survey number.
- Village Form 6 entries showing the ownership chain.
- A title clearance certificate from an advocate.
- A layout plan approved by the local planning authority.
- A joint application, or a registered power of attorney, if there are several owners.
- The fee challan generated on iORA and paid online.
Our AnyROR 7/12 guide shows how to pull and read the land records first.
How does the NA conversion process work, step by step?
- Check the land records on AnyROR and fix any mismatch in names or area.
- Confirm the tenure. Owners of restricted (“new tenure”) land must first convert it to old tenure, which involves a premium.
- Get the layout approved by the local planning authority.
- Apply on iORA with the documents and pay the challan.
- Site verification and measurement follow, usually with a land records survey.
- The Collector issues the NA order, and the revenue office then updates the 7/12 to show non-agricultural use.
Why do NA applications get rejected?
Usually, most rejections trace back to a handful of problems. For example:
- The measured area does not match the 7/12.
- The records show a bank charge, court case or revenue dispute against the land.
- There is no legally recognised access road on the village map.
- The land lies in an eco-sensitive or coastal regulation zone.
- Sub-plots are below the minimum size allowed by planning rules.
In such cases, fix the underlying issue first, because a fresh application with the same defect will face the same result.
What should buyers check about an NA plot?
On the other hand, if you are buying rather than converting, ask the seller for the NA order and check that it matches the survey number, area and permitted use. In addition, confirm that the layout is approved and that the developer has registered the plotted project with Gujarat RERA where the law requires it. Our Dholera residential plots guide lists the full checklist for plots around Dholera.
How Landbitt fits in
Finally, Landbitt sells full NA-ready plots in the Dholera region with direct ownership through a registered sale deed, such as the Shyam Vihar project in Village Aakru. Separately, Landbitt offers fractional participation from 1 sq. ft. or ₹20,000, whichever is higher, where investors hold profit rights in an SPV. Neither option guarantees returns.
Frequently Asked Questions
What is NA conversion in Gujarat?
NA conversion is the permission to use agricultural land for a non-agricultural purpose, such as housing, shops or industry. In Gujarat, the District Collector grants it under Section 65 of the Gujarat Land Revenue Code, 1879.
Who grants NA permission in Gujarat?
The District Collector usually issues the NA order. You file applications online through the iORA (Integrated Online Revenue Applications) portal.
How long does NA conversion take in Gujarat?
Officials generally aim to decide a clean, undisputed application in about 45 to 90 days after complete documents and site verification. Delays are common when records, measurements or access roads have issues.
What documents are needed for NA conversion in Gujarat?
Typically the 7/12 and 8A extracts, Village Form 6 entries, a title clearance certificate from an advocate, an approved layout plan from the local authority, consent or a power of attorney from all owners, and the fee challan.
Do I need NA permission for land inside a TP scheme?
Land in a finalised town planning scheme that is already zoned for residential or commercial use may be treated as deemed NA, but owners still have to complete the registration and pay the applicable premium. Confirm the status with the local authority.
The Bottom Line
NA conversion in Gujarat is routine when the records are clean. Check the 7/12, fix tenure and access issues first, file a complete application on iORA, and buy only plots whose NA order matches the land you see.